Spill Crew Tank-Fed Safety Showers deliver dependable emergency decontamination where mains water is unavailable, unreliable or lacks sufficient pressure or flow.
Ideal for mining, chemical handling, manufacturing, agricultural and remote Australian work sites. The self-contained 1500L overhead tank stores a dedicated supply of water, gravity-feeding the shower to deliver a compliant flow rate for the full 15-minute deluge duration, in line with the requirements of AS4775-2007, EN15154 and ANSI Z358.1-2014.
The insulated, jacketed tank is designed to help maintain tepid water temperatures, reducing thermal shock risks in extreme heat. Made from corrosion-resistant materials, the unit is built to perform in demanding industrial environments.
Tank-Fed Safety Shower features:
- Manufactured to meet AS4775-2007, EN15154 and ANSI Z358.1-2014 requirements
- 1500L polyethylene tank – jacketed & insulated to assist with temperature control
- No reliance on mains water supply
- Corrosion-resistant construction for harsh environments
- Suitable for indoor or outdoor installation
- Full range of optional upgrades also available such as: chiller units, eye/face wash units, lighting and alarm systems
Standard offering comes complete with: water storage tank, support frame, safety signage, level indicator, thermometer, fixing bolt set, earthing boss and tagging plate.
Standard Offering Complete with:
| Component | Item Description |
| Water Storage Tank | 1500L, jacketed and insulated, polyethylene tank |
| Support Frame | Stainless steel frame for enhanced durability and structural support |
| Safety Signage | High-visibility signage for clear identification |
| Level Indicator | Provides a clear visual indication of tank water level |
| Thermometer | Allows accurate monitoring of water temperature |
| Fixing Bolt Set | M16, 316 stainless steel anchor bolts for secure installation (set of 4) |
| Earthing Boss | Built-in connection point for safe electrical grounding |
| Tagging Plate | Identification plate for asset tracking and compliance |
Optional Extras Include:
| Component | Item Description |
| Internal Eye/Face Wash | Integrated eye/face wash station for immediate first aid response |
| Eye/face Wash Activation Switch | Automatically detects activation for local alarm |
| Eye/face Wash Treadle Foot Control | Hands-free foot-operated control for activating water flow |
| Side Paneling | White GRP side and rear panels for added protection and enclosure |
| Sun Canopy | Overhead canopy to provide additional tank temperature control |
| Walk On Panel | Durable GRP walk-on grating with integrated foot activation panel |
| Drain Sump | Stainless steel frame and GRP drain sump with outlet |
| Audible & Visual Alarm | Combined alarm system to alert nearby personnel when the unit is activated |
| Water Treatment System | Helps maintain water quality and reduce bacterial growth |
| Lighting | Integrated light for improved visibility in low-light conditions |
| Zero Power Cooler | Cools stored water to maintain safe, tepid water temperature |
| Immersion Heater | Heats water to maintain minimum temperature requirements in cold conditions |



